Construction Considerations: Revision history

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

3 June 2023

29 May 2023

  • curprev 17:5817:58, 29 May 2023Kelly talk contribs 769 bytes +769 Created page with "== Stormwater Management == Any addition of non permeable surfaces will incur issues with rainwater management. This is usually based on the % of land covered in non permeable surfacing. * Underground basin may be an option * Keeping parking lot permeable (e.g. gravel) cuts down on % covered * Routing gutters to rain garden may cut down on basin size needed * Green roof may reduce basin size ** Green roof increases roof load, installation + maintenance costs ** Provides..." Tag: Visual edit