Facility Planning: Difference between revisions
No edit summary |
No edit summary |
||
| (One intermediate revision by the same user not shown) | |||
| Line 12: | Line 12: | ||
Need ability to easily convert between purposes where applicable (e.g. seating or a stage for shows in areas that are usually used for training) | Need ability to easily convert between purposes where applicable (e.g. seating or a stage for shows in areas that are usually used for training) | ||
== | == Circus Facilities == | ||
=== Trampoline / Wall === | === Trampoline / Wall === | ||
| Line 35: | Line 35: | ||
=== Static Aerials === | === Static Aerials === | ||
* | * 16+ indoor points on pulleys | ||
* 4+ outdoor points | * 4+ outdoor points | ||
| Line 41: | Line 41: | ||
* Indoor rig for year round flying | * Indoor rig for year round flying | ||
=== To Prioritize === | |||
* Chinese Pole | |||
* Tightwire | |||
== General Facilities == | |||
* Reception Desk (size TBD) | |||
* Bathroom (x2?) | |||
* Shower | |||
* Equipment storage (size TBD) | |||
* Member storage (size TBD) | |||
==Wish List== | ==Wish List== | ||
These are things that are potential nice-to-haves that might add too much to the construction cost to justify | These are things that are potential nice-to-haves that might add too much to the construction cost to justify | ||
Latest revision as of 17:41, 7 June 2023
Construction Considerations - Go here for more nuts and bolts construction stuff
General Concepts
Needs to feel put together. Aesthetic can be whatever you want, but it needs to be intentional. No random piles of hand me down garbage.
Need comfortable spaces to hang out near training areas.
Need performance area.
Fly rig needs dedicated space.
Need ability to easily convert between purposes where applicable (e.g. seating or a stage for shows in areas that are usually used for training)
Circus Facilities
Trampoline / Wall
- 10' x 17' bed + edge padding
- Bed material options
- TKTK (PSCA-style bed)
- TKTK (Brooklyn Zoo-style bed)
Foam Pit
- Bottom options
- Edge pads
Tumbling Area
- Eventual plan for spring floor?
- Standard gymnastics floor is a 39 ft square (diagonal of 55 ft, which is a good reference length for any reasonable tumbling pass)
Static Aerials
- 16+ indoor points on pulleys
- 4+ outdoor points
Flying Trapeze
- Indoor rig for year round flying
To Prioritize
- Chinese Pole
- Tightwire
General Facilities
- Reception Desk (size TBD)
- Bathroom (x2?)
- Shower
- Equipment storage (size TBD)
- Member storage (size TBD)
Wish List
These are things that are potential nice-to-haves that might add too much to the construction cost to justify
- Upper level viewing area (a la ECTA), adds a wow factor for watching most things but especially flying and could be good for shows/event
Existing Facilities
Necca Trapezium - Brattleboro, VT
$1.6M Building cost, designed by Turner Brooks Architect [3]
Madison Circus Space - Madison, WI
Estimated building cost $1M