Construction Considerations

From Circus Coop Wiki
Revision as of 17:58, 29 May 2023 by Kelly (talk | contribs) (Created page with "== Stormwater Management == Any addition of non permeable surfaces will incur issues with rainwater management. This is usually based on the % of land covered in non permeable surfacing. * Underground basin may be an option * Keeping parking lot permeable (e.g. gravel) cuts down on % covered * Routing gutters to rain garden may cut down on basin size needed * Green roof may reduce basin size ** Green roof increases roof load, installation + maintenance costs ** Provides...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Stormwater Management

Any addition of non permeable surfaces will incur issues with rainwater management. This is usually based on the % of land covered in non permeable surfacing.

  • Underground basin may be an option
  • Keeping parking lot permeable (e.g. gravel) cuts down on % covered
  • Routing gutters to rain garden may cut down on basin size needed
  • Green roof may reduce basin size
    • Green roof increases roof load, installation + maintenance costs
    • Provides passive cooling in summer, potentially recouping installation costs in 6 years
    • May require irrigation for max cooling
    • Possible tax credits depending on municipality

Building Structural Load

Needs to support roof, snow load, 8 - 16 aerial points @ 10,000 lb live load , and fly rig